Zhambyl oblast Akim reports to Kazakhstan President on post-storm restoration

ПОДЕЛИТЬСЯ

Zhambyl oblast Akim reports to Kazakhstan President on post-storm restoration Akim of Zhambyl oblast Kanat Bozumbayev. Photo courtesy of zhambyl.kz

Akim (Governor) of Zhambyl oblast reported to Kazakhstan President Nazarbayev on the results of restoration works after the devastating January storm, Tengrinews.kz reports citing Kazakhstan President’s press-service. According to the Akim, almost all the storm-hit facilities have been restored. Their total number is 4,700. The roofs of the buildings have been repaired, as well as over 1 thousand of power line poles. The total damage has been evaluated at 4.5 billion tenge ($30 million). During the meeting with Nursultan Nazarbayev the Akim of Zhambyl oblast also reported on the results of the social and economic development of the region in 2012 and the preliminary results of the first two months of 2013. According to him, the oblast’s GRP (gross regional product) grew 9.7 percent, and growth in the construction sector made 67 percent. The volume of investments into the regional economy increased by 32 percent. The storm hit Zhambyl oblast on January 12, 2013 and left Zhanatas and Karatau towns and several villages without electricity, water, gas and communications. Roofs were fully or partially ripped off from 425 multi-storey facilities, including 158 multi-storey residential buildings, 37 educational and 23 healthcare facilities. Nearby Taraz city was affected by storm as well: its power lines were damaged, roofs of many houses, hospitals, schools were ripped off, trees and road signs were scattered in the streets.

ПОДЕЛИТЬСЯ
Akim (Governor) of Zhambyl oblast reported to Kazakhstan President Nazarbayev on the results of restoration works after the devastating January storm, Tengrinews.kz reports citing Kazakhstan President’s press-service. According to the Akim, almost all the storm-hit facilities have been restored. Their total number is 4,700. The roofs of the buildings have been repaired, as well as over 1 thousand of power line poles. The total damage has been evaluated at 4.5 billion tenge ($30 million). During the meeting with Nursultan Nazarbayev the Akim of Zhambyl oblast also reported on the results of the social and economic development of the region in 2012 and the preliminary results of the first two months of 2013. According to him, the oblast’s GRP (gross regional product) grew 9.7 percent, and growth in the construction sector made 67 percent. The volume of investments into the regional economy increased by 32 percent. The storm hit Zhambyl oblast on January 12, 2013 and left Zhanatas and Karatau towns and several villages without electricity, water, gas and communications. Roofs were fully or partially ripped off from 425 multi-storey facilities, including 158 multi-storey residential buildings, 37 educational and 23 healthcare facilities. Nearby Taraz city was affected by storm as well: its power lines were damaged, roofs of many houses, hospitals, schools were ripped off, trees and road signs were scattered in the streets.
Tengrinews
Читайте также
Join Telegram
Dollar dropped sharply in Kazakhstan
Trump sends gifts to Tokayev
Earthquake occurred in the Caspian Sea
Cold front approaches Kazakhstan
Earthquake struck Almaty
Tokayev sends telegram to Emir of Qatar
New Year trees lit up in Almaty
Kazakhstan and Japan sign 14 documents
Kazakhstan celebrates Independence Day
Dollar resumes slide in Kazakhstan
Astana Airport has addressed passengers
Interior Ministry warns Kazakhstanis

Exchange Rates

 511.47  course up  605.47  course up  6.56  course down

 

Weather

location-current
Алматы

 

Редакция Advertising
Социальные сети